iMOST is manufactured in China at ISO 13485–certified facilities
-
Q
Where is iMOST manufactured?
A -
Q
How long does a test take?
A· iMOST-L: ~3–3.5 minutes
· iMOST-U: ~4–4.5 minutes
-
Q
Is iMOST limited to CBC testing?
ANo. CBC is the first assay on a multi-assay platform
-
Q
What are the recommended storage conditions for test consumables?
ARoom temperature storage supported
-
Q
Can Essenlix support large-scale deployments?
AYes. Manufacturing capacity is designed to support global-scale deployments
-
Q
Is cloud connectivity required?
ANo. Cloud connectivity is optional. Local data transmission is supported when required
-
Q
Can iMOST integrate with LIS/HIS systems?
AYes. iMOST supports HL7 and direct system integration
-
Q
Do you participate in external QC programs (e.g., CAP, Randox)?
AExternal QC participation is under evaluation. Traditional QC materials may not always be compatible due to differences in measurement principles
-
Q
What happens if QC fails?
AResponse depends on the error type. Troubleshooting can often be performed remotely; in some cases, hardware replacement may be required
-
Q
Is calibration required?
ANo routine calibration is required. Devices are factory calibrated
-
Q
What quality control mechanisms are used?
AiMOST incorporates multiple QC layers:
· Automatic electrical, optical, and system checks
· Solid QC card (pass/fail)
· Optional third-party liquid QC materials (with defined acceptable ranges)
-
Q
Is training required?
AYes, but training requirements are minimal. Remote or online training (≈1 hour) is typically sufficient